Feb 13, 2021     Wiring, circuit breaker panel; Cabin heat box - (2.3 hours)       Category: Electrical
1. Continued to prep wires for installation below the circuit breaker panel. Added heat shrink labels and trimmed wire lengths. [No photo]

2. Installed the scat tube connector (the aft side of the cabin heat valve) on the firewall.


 